Ministry of Forests, Lands and Natural Resource Operations


FORT ST. JOHN PILOT PROJECT REGULATION
– Continued –

B.C. Reg. 278/2001
(last amendment: August 5, 2003)



Part 1 – Interpretation and Application

Part 2 – Participants

Part 3 – Basic Planning and Performance Requirements

Division 1 – Pre-existing Plans, Prescriptions and Permits

Division 2 – Forest Development Plans

Division 3 – Site Level Planning

Division 4 – Authorizations and Variances

Division 5 – Field Performance Requirements

Part 4 – Sustainable Forest Management Plans

Division 1 – Content

Division 2 – Approval Process

Division 3 – Effect of Approval of Sustainable Forest Management Plan

Division 4 – Amendments

Division 5 – Forest Operations Schedules

Part 5 – Public Accountability

Division 1 – Public Advisory Group

Division 2 – Pilot Project Monitoring and Evaluation

Division 3 – Enforcement

Division 4 – Public Access to Information

Part 6 – General

Schedule A – Balancing Competing Values and Interests

Part A1 – Management Zones and Their Objectives

Part A2 – Fort St. John Pilot Project Management Zone Map

Schedule B – Forest Development Plans

Part B1 – Preparation

Part B2 – Review and Comment

Part B3 – Approval

Schedule C – Preparing Forest Operations Schedules

Schedule D – Riparian Management

Schedule E – Green up

Schedule F – Reforestation

Schedule G – Maximum Administrative Penalties


  Schedule E – Green up

  (Sections 1, 28 and 67)
 
 
  Greened-up
 
96   An area is greened-up if
      (a) at least 75% of the previously harvested cutblock area meets the minimum stocking requirements specified in Schedule F, and
      (b) the average height of the tallest 10% of the trees is a minimum of 3m.
 
 
  Harvesting adjacent to areas that are not greened-up
 
97   For the purposes of section 28 (1) (b) (iv), a participant may harvest a cutblock that is adjacent to a previously harvested cutblock that is not greened-up, if the requirements in any of the following paragraphs are met:
      (a) the previously harvested cutblock was harvested under a licence to cut or a Christmas tree permit;
      (b) a partial cut silvicultural system is used that retains trees in a uniform distribution throughout the cutblock to be harvested, and 40% or more of the pre-harvest basal area will be retained;
      (c) the total area of
        (i) the cutblock to be harvested, and
        (ii) the harvested cutblocks that are not greened-up and that are adjacent to the cutblock to be harvested
        does not exceed the maximum size for cutblocks specified or varied under Schedule B;
      (d) the harvesting of the cutblock is necessary to achieve established visual quality objectives;
      (e) the resultant opening has been authorized by the district manager, in a written notice given to the person, on the grounds that it will be consistent with the structural characteristics and the temporal and spatial distribution of natural openings;
      (f) the proposed harvesting will recover timber that was damaged by fire, insects, wind or other similar events and, if possible, the cutblock to be harvested incorporates structural characteristics of natural disturbance.
 
 

NEW NEW indicate most recent changes to this page