Regulations
- Forest Practices Code of BC ActOPERATIONAL AND SITE PLANNING REGULATION
PART 10 - GREEN-UP
B.C. Reg. 107/98 Deposited April 2, 1998
O.C. 0426/98 effective June 15, 1998, (Consolidated to December 12, 2003)
- 67. In this
Part:
"adequately stocked" means having
(a) on the
Coast, 800 or more trees per ha, and
(b) in the Interior, 1 000 or more trees per ha,
that are a
commercially valuable species and at least 1.3 m in height;
"cutblock" means a cutblock as defined in
the Act, except that the licence, forest development plan or
permit referred to in that definition means the most recently
approved licence, plan or permit for the area, whether or not it
has expired;
"net area" means, with respect to a cutblock,
(a) the net area
to be reforested as identified in the most recent silviculture
prescription for the cutblock, whether or not the silviculture
prescription has expired, or
(b) if no silviculture prescription identifies a net area to be reforested for the
cutblock, the area of the cutblock excluding all of the following:
(i) any area
occupied by permanent access structures;
(ii) any area
of rock, wetland or other area that in its natural state is
incapable of growing commercially valuable trees;
(iii) any
contiguous area within the cutblock of more than 4 ha that is
composed of non-commercial forest cover;
(iv) any area reserved from harvesting because of wildlife trees or riparian reserve
zones;
- 68. (1) When exercising a discretion under subsection (3) or (5) to (8), the
district manager
(a) may exercise
the discretion with respect to a cutblock or all or part of the
forest district, and
(b) must give written notice of the applicable requirement or variation to any agreement
holder who may be affected.
(2) When exercising a discretion under subsection (3) (a) or (6), the district manager
must be satisfied that
(a) any increase
in green-up requirements is necessary to adequately manage and
conserve hydrological, wildlife, recreational and scenic values,
and
(b) any decrease in green-up requirements will adequately manage and conserve these
values.
(3) A cutblock is greened-up if the follwing portion or percetange of the cutblock meets
the requirements of subsections (4) to (8):
(a) 75% of its
net area, or another percentage of its net area specified by the
district manager, or
(b) another portion of the cutblock specified by the district manager, that is
(i) adjacent
to the cutblock proposed for harvest, and
(ii) sufficient in size to adequately manage and conserve the forest resources.
(4) If a higher
level plan specifies a requirement that is different than a
requirement referred to in this section, the requirement specified
in the higher level plan prevails to the extent of the difference.
(5) If no higher level plan specifies a green-up requirement that applies to the cutblock,
the cutblock is greened-up if it is
(a) adequately stocked and the average height of those trees that are
(i) the
tallest tree in each 0.01 ha plot included in a representative
sample, and
(ii) a commercially valuable species or other species acceptable to the district manager
is at least 3m
or another height specified under subsection (8), or
(b) not adequately stocked, and
(i) the average height of those trees that are
(A) the
tallest tree in each 0.01 ha plot included in a
representative sample, and
(B) a commercially valuable species or other species acceptable to the district manager
is at least
3.5 m or another height specified under subsection (8), and
(ii) either
(A) the
cutblock is stocked with at least 500 trees per ha for the
Coast or 700 trees per ha for the Interior, that are a
commercially valuable species and at least 1.3 m in height,
or
(B) the person proposing to harvest areas adjacent to the cutblock satisfies the district
manager that the cutblock is stocked with a sufficient number of trees per ha of a species
that will result in adequate management and conservation of hydrological, wildlife,
recreational and scenic values.
(6) In addition to
the requirements under subsection (5), if the district manager has
specified that a number of trees per ha of at least 3 m in height
is reqired for a cutblock to be greened-up, the cutblock must have
at least that number to be greened-up.
(7) For the purpose of subsection (5), the district manager may specify that a species is
excluded from being counted for the purpose of determining the average height of the
tallest trees, if the district manager determines that the species
(a) if
deciduous, does not result in adequate management and
conservation of hydrological, wildlife, recreational or scenic
values, or
(b) may be subject to removal or modification.
(8) The district manager may vary an average height requirement referred to in subsection
(5)
(a) to a height
that is less than 3 m, if the district manager is satisfied that the reduced height will
adequately manage and conserve the forest resources, or
(b) to a height that is greater than 3 m, if the district manager is satisfied that a
greater height is necessary to adequately manage and conserve hydrological, wildlife,
recreational and scenic values.
indicate most recent